An effective RRU installation & commissioning guide includes critical install and configuration steps of all network RRUs. It has to deal with the complete physical installation of the RRU, including its location on a tower as well as within a building. The document also covers interfacing the RRU with other network components which include the BBU, antennas, and power feeds. First level configuration, calibration, and testing which is called commissioning procedures are also included. If all the recommended corrective actions are taken, the RRU will be optimally installed and maintained. This minimizes potential failures and network problems caused by poor installation.